Probable mitigation procedures

HOME

New Page 1
Template018-Sliced
 

-

Rewiring the grounding system to ensure proper bonding of all electrical connections. Isolated ground system is preferable for a building which have large nonlinear load.

-

Enhanced earth electrode systems, including buried ground rings or multiple ground rods to ensure very low resistance to ground.

-

Replacement or upgrading of undersize phase conductors to reduced voltage drop.

-

Use double size neutral conductors or separate neutral for each phase.

-

Segregate sensitive loads on separate branch circuits, fed from a separate panel board and allowing fewer outlets per circuit.

-

Use harmonic filters

-

Use power conditioners (TVSS)

-

Use delta-wye transformers design for nonlinear loads.
However the final recommendation for mitigation procedures will be proposed after the final analysis have been made. These mitigation works are not included in the propose scope of work.